  1. 1. 069 – Oregon Rule and Law Version 2023

    1
    For the purposes of electrical licensing, an Industrial Plant can include a ________.
    Reference : 918-251-0090
  2. 2. 154 – Oregon Rule and Law Version 2023

    1
    A limited energy contractor can use a limited minor electrical permit for ________.
    Reference : 918-309-0220(6)
  3. 3. 092 – Oregon Rule and Law Version 2023

    1
    The Oregon State rules also modified the 2023 NEC arc fault requirements for dormitory unit receptacles by additionally adding ________ areas.
    Reference : Table 1-E 210.12(C)
  4. 4. 153 – Oregon Rule and Law Version 2023

    1
    A limited maintenance specialty contractor can take advantage of a minor label electrical permit to replace up to ________ ballasts for light fixtures under one minor permit.
    Reference : 918-309-0220(5)
  5. 5. 002 – Oregon Rule and Law Version 2023

    1
    Minor labels sold by the division for electrical installations shall be sold ___________.
    Reference : 918-100-0030
  6. 6. 012 – Oregon Rule and Law Version 2023

    1
    A licensed general journey-level electrician is authorized to do ________.
    Reference : 918-282-0170
  7. 7. 132 – Oregon Rule and Law Version 2023

    1
    A stop-work order may only be issued for ________ violations of the minimum electrical safety standards.
    Reference : 918-309-0075(2)
  8. 8. 133 – Oregon Rule and Law Version 2023

    1
    The Oregon Electrical Specialty Code allows ________ to purchase and use temporary electrical work permits.
    Reference : 918-309-0080(1)
  9. 9. 089 – Oregon Rule and Law Version 2023

    1
    The 2023 NEC added additional GFCI protection requirements for aquariums and bait wells. The Oregon rules modified with an exception if the device is installed ________ and a single receptacle is installed.
    Reference : Table 1-E 210.8(B)ex7
  10. 10. 010 – Oregon Rule and Law Version 2023

    1
    The general signing supervising electrician shall ________
    Reference : 918-282-0140
  11. 11. 086 – Oregon Rule and Law Version 2023

    1
    A new alterative method from the 2023 NEC to recondition and restore electrical equipment in Oregon is to use replacement parts ________.
    Reference : Table 1-E 110.20
  12. 12. 031 – Oregon Rule and Law Version 2023

    1
    Generally, all outdoor ________ for other than dwelling units, that are supplied by single-phase branch circuits rated 150 volts to ground or less (50 amperes or less) shall have GFCI protection
    Reference : Table 1-E , 210.8(F)
  13. 13. 083 – Oregon Rule and Law Version 2023

    1
    A change in the definition of servicing in the Oregon rules now includes the ________ of used equipment with listed or recognized components. (Also can be a factor when it comes to licensing compliance.)
    Reference : Table 1-E 100 Definitions
  14. 14. 044 – Oregon Rule and Law Version 2023

    1
    Receptacles shall not be installed within or above a bathtub,
    Reference : Table 1-E , 406.9(C)
  15. 15. 115 – Oregon Rule and Law Version 2023

    1
    An unexpired permit holder ________ for an extension of time within which work may be completed.
    Reference : 918-309-000(6)
  16. 16. 042 – Oregon Rule and Law Version 2023

    1
    An interior of a raceway installed in a wet location shall also be considered a wet location, unless _____
    Reference : Table 1-E , 300.9 ex
  17. 17. 047 – Oregon Rule and Law Version 2023

    1
    Sump and sewage pumps are generally required to be protected with Class A GFCI protection for personnel, unless
    Reference : Table 1-E , 422.5(A)(6)
  18. 18. 059 – Oregon Rule and Law Version 2023

    1
    When a swimming pool pump motor is replaced, the pump motor
    Reference : Table 1-E , 680.21(D)
  19. 19. 052 – Oregon Rule and Law Version 2023

    1
    Part II of NEC Article 517 shall not apply to ________ areas.
    Reference : Table 1-E , 517.10(B)
  20. 20. 124 – Oregon Rule and Law Version 2023

    1
    If an electrical contractor begins the electrical installation before a required plan review is completed ________.
    Reference : 918-309-0025(1)