Test Quiz

Please sign up for the before taking this quiz.
Back
  1. 1. 087 – Oregon Rule and Law Version 2023

    1
    The 2023 NEC clarified the general rules regarding identification of disconnecting means. Oregon additionally noted that the location of the circuit source information should include ________.
    Reference : Table 1-E 110.22(A)
  2. 2. 129 – Oregon Rule and Law Version 2023

    1
    When an electrical service was disconnected for repairs, if a major violation of the service exists, ________.
    Reference : 918-309-0040(9)
  3. 3. 055 – Oregon Rule and Law Version 2023

    1
    Feeders and Branch Circuits that supply power and installed on docking facilities
    Reference : Table 1-E , 555.35(A)
  4. 4. 160 – Oregon Rule and Law Version 2023

    1
    Renewable Electrical Energy Bulk Labels may be purchased by ________.
    Reference : 918-309-0410(1)
  5. 5. 060 – Oregon Rule and Law Version 2023

    1
    For a Natural and Artificially Made Body of Water, outlets supplied by branch circuits not exceeding ________ single phase, shall be provided with GFCI protection for personnel
    Reference : Table 1-E , 682.2(A)
  6. 6. 051 – Oregon Rule and Law Version 2023

    1
    If electrical switchgear has been damaged by fire or water, it shall be evaluated by ________ prior to being returned to service
    Reference : Table 1-E , 490.49
  7. 7. 029 – Oregon Rule and Law Version 2023

    1
    GFCI protection shall not be required for a single receptacle serving an appliance if
    Reference : Table 1-E , 210.8(B)ex 8
  8. 8. 008 – Oregon Rule and Law Version 2023

    1
    When a general supervising electrician is working for an electrical contractor, he/she may design, plan, and lay out work for ________.
    Reference : 918-282-0140
  9. 9. 098 – Oregon Rule and Law Version 2023

    1
    The 2023 NEC additionally required barriers to cover the exposed energized bussing for service panelboards. The State of Oregon rules ________.
    Reference : Table 1-E 230.62(C)
  10. 10. 024 – Oregon Rule and Law Version 2023

    1
    When doors are required to be equipped with panic hardware, the panic hardware for quick egress shall be ________.
    Reference : Table 1-E, 110.26 (C)(3)
  11. 11. 040 – Oregon Rule and Law Version 2023

    1
    For dwelling units, an outdoor disconnect is required as an emergency disconnect. The disconnect can be a
    Reference : Table 1-E , 230.85
  12. 12. 038 – Oregon Rule and Law Version 2023

    1
    Each meeting room of not more than 1,000 square feet
    Reference : Table 1-E , 210.65
  13. 13. 082 – Oregon Rule and Law Version 2023

    1
    A new clarification of the NEC definition of a structure in Oregon now includes ________.
    (Important when it comes to floating a neutral or not.)
    Reference : Table 1-E 100 Definitions
  14. 14. 002 – Oregon Rule and Law Version 2023

    1
    Minor labels sold by the division for electrical installations shall be sold ___________.
    Reference : 918-100-0030
  15. 15. 058 – Oregon Rule and Law Version 2023

    1
    For a swimming pool, ________ shall be permitted to required periodic inspections and/or testing.
    Reference : Table 1-E , 680.4
  16. 16. 107 – Oregon Rule and Law Version 2023

    1
    Ground-Fault Circuit-Interrupter Protection (GFCI) for personnel was modified in the NEC to cover all receptacles for electric hand tools or portable lighting in work areas for welders. The Oregon amendments ________.
    Reference : Table 1-E 630.8
  17. 17. 115 – Oregon Rule and Law Version 2023

    1
    An unexpired permit holder ________ for an extension of time within which work may be completed.
    Reference : 918-309-000(6)
  18. 18. 143 – Oregon Rule and Law Version 2023

    1
    A master electrical work permit is used by industrial plants and governmental entities. A master permit is ________.
    Reference : 918-309-0100(2)
  19. 19. 095 – Oregon Rule and Law Version 2023

    1
    Additional surge protection for feeders was a major change in the NEC. The State of Oregon ________.
    Reference : Table 1-E 215.18
  20. 20. 049 – Oregon Rule and Law Version 2023

    1
    Need to be specifically approved by a supervisor
    Reference : Table 1-E , 445.19(C)
Back