Oregon Rule and Law Version 2023 Quiz Please sign up for the before taking this quiz. Back Save Progress Retry Finish 1. 070 – Oregon Rule and Law Version 20231In Oregon, a Jurisdictional Inspector can be a ________. State or municipal inspector Municipal inspector only State inspector only County inspector only Reference : 918-251-0090 2. 151 – Oregon Rule and Law Version 20231A limited maintenance specialty HVAC/R contractor may use a minor electrical permit label if the single phase installation does not exceed ________. 150 volts to ground 208 volts to ground 240 volts to ground 250 volts to ground Reference : 918-309-0220(5) 3. 059 – Oregon Rule and Law Version 20231When a swimming pool pump motor is replaced, the pump motor Is not required to be GFCI protected Shall be double insulated Shall be constructed with EP overload protection Is required to be GFCI protected Reference : Table 1-E , 680.21(D) 4. 032 – Oregon Rule and Law Version 20231In a dwelling unit, AFCI protection shall not be required for 120 volt, single phase, 15 and 20 ampere branch circuits supplying receptacles located in All of these statements are true Hallways Laundry areas Kitchens Reference : Table 1-E , 210.12(B)ex 2 5. 037 – Oregon Rule and Law Version 20231A deck or porch that is located above grade is required to have at least 1 receptacle outlet installed, unless It has a depth of 1 foot or less It has a depth of 2 feet or less It has an area of less than 25 square feet It has an area of less than 30 square feet Reference : Table 1-E , 210.52(E)(3) 6. 097 – Oregon Rule and Law Version 20231The NEC allows service-entrance conductors to be spiced and tapped. Power distribution blocks and pressure connectors are required by the Oregon Rules to be ________. Listed Marked suitable for service Marked suitable for use on the line side Rated for a minimum of 60K IC Reference : Table 1-E 230.46 7. 016 – Oregon Rule and Law Version 20231A licensed journey-level limited sign electrician is not permitted to Perform work on service equipment Install outline lighting Extend any sign circuit Install electrical signs Reference : 918-282-0220 8. 025 – Oregon Rule and Law Version 20231In the State of Oregon, all ________ 15 and 20 ampere receptacles installed in dwelling unit locations specified in 210.8(A)1-10 shall have GFCI protection for personnel. 125 volt single phase only 125 volt single phase through 208 volt 125 volt single phase through 250 volt 250 volt single phase Reference : Table 1-E, 210.8(A) 9. 156 – Oregon Rule and Law Version 20231A properly licensed electrical contractor may use a minor label permit for a circuit extension of not more than ________ electrical circuits limited to 60 amps and not more than 150 volts to ground. 3 2 1 4 Reference : 918-309-0220(7) 10. 048 – Oregon Rule and Law Version 20231Stationary generators 600 volts and less Are not required to be listed Shall be listed Shall be identified only Need to be specifically approved by a supervisor Reference : Table 1-E , 445.6 11. 086 – Oregon Rule and Law Version 20231A new alterative method from the 2023 NEC to recondition and restore electrical equipment in Oregon is to use replacement parts ________. Selected by the supervising electrician Designed by any engineer By the manufacturer only Selected by the electrical inspector Reference : Table 1-E 110.20 12. 010 – Oregon Rule and Law Version 20231The general signing supervising electrician shall ________ Sign all permits Pay for all permits Fill out all permits Process all permits Reference : 918-282-0140 13. 035 – Oregon Rule and Law Version 20231In a dormitory unit, AFCI protection shall not be required for 120 volt, single phase, 15 and 20 ampere branch circuits supplying receptacles located in Bathrooms Closets Hallways Living rooms Reference : Table 1-E , 210.12(C) 14. 005 – Oregon Rule and Law Version 20231Electrical licenses in Oregon are not required to do testing of electrical products in _________. All of these statements are true. A recognized UL testing lab Industrial plants An electrical shop Reference : 918-282-0110 15. 120 – Oregon Rule and Law Version 20231The Oregon Electrical Specialty Code does not require an electrical work permit for ________. Some minor electrical installations that can use a minor installation label Homeowners C.O.P. locations Any low voltage applications Reference : 918-309-000(10) 16. 078 – Oregon Rule and Law Version 20231An example of the exemption for an underground signal loop from inspections would be a Class 2 ________. Traffic signal device Audio system CCTV system Security system Reference : 918-261-0025 17. 131 – Oregon Rule and Law Version 20231Any person that commences and starts the electrical work before an electrical work permit is issued will be subject to ________. An investigative fee A license revocation A criminal fine A civil penalty Reference : 918-309-0070(12) 18. 026 – Oregon Rule and Law Version 20231In Oregon State, ________ in a dwelling unit are not required to have GFCI protection for all 125 volt, single phase, 15-20 ampere receptacles Kitchen receptacles that do not serve the countertop Laundry areas Garages Outdoors Reference : Table 1-E , 210.8(A)(6) 19. 021 – Oregon Rule and Law Version 20231Requests for special permission to waive specific requirements in Oregon shall be in writing and shall be obtained Prior to the start of the electrical work Within 1 week of the start of the electrical work With a 250 dollar fee AAnd considered and determined within 1 week Reference : Table 1-E, 90.4 20. 011 – Oregon Rule and Law Version 20231A limited supervising electrician may direct an electrical installation in an existing _________. Hospital Duplex Dwelling Unit Multifamily structure Reference : 918-282-0160 21. 089 – Oregon Rule and Law Version 20231The 2023 NEC added additional GFCI protection requirements for aquariums and bait wells. The Oregon rules modified with an exception if the device is installed ________ and a single receptacle is installed. Indoors Outdoors Above 5 feet Above 6 feet Reference : Table 1-E 210.8(B)ex7 22. 088 – Oregon Rule and Law Version 20231The 2023 NEC defines a kitchen which includes an area with sinks and permanent provisions for food preparation. Th Oregon State rules Did not adopt this definition Expanded the definitions to outside wet bars Expanded the definition to include beverage preparation Have adopted the 2023 NEC definition Reference : Table 1-E 210.8(A) 23. 042 – Oregon Rule and Law Version 20231An interior of a raceway installed in a wet location shall also be considered a wet location, unless _____ It is installed solely for physical protection It is installed inside a building It is installed above grade The raceway is 20 feet or less in length Reference : Table 1-E , 300.9 ex 24. 033 – Oregon Rule and Law Version 20231In a dwelling unit, AFCI protection shall not be required for 120 volt, single phase, 15 and 20 ampere branch circuits supplying receptacles located in Locations with dedicated outlets that supply equipment known to cause unwanted tripping All of these statements are true Sunrooms with GFCI protection Living rooms with dedicated circuits Reference : Table 1-E , 210.12(B) ex 3 25. 050 – Oregon Rule and Law Version 20231Personnel doors intended for egress from designated battery rooms shall be equipped with Panic or fire exit hardware Listed panic hardware Listed fire exit hardware Instructions posted on the door Reference : Table 1-E , 480.10(E) 26. 153 – Oregon Rule and Law Version 20231A limited maintenance specialty contractor can take advantage of a minor label electrical permit to replace up to ________ ballasts for light fixtures under one minor permit. 10 15 12 20 Reference : 918-309-0220(5) 27. 077 – Oregon Rule and Law Version 20231There is an exemption from permits for the repair or replacement of an HVAC ________. Capacitor Flex whip Disconnect Branch Circuit Reference : 918-261-0020 28. 071 – Oregon Rule and Law Version 20231When an electrical item is Labeled, it will have an identifying mark by ________. An NRTL UL only CSA or UL only ETL only Reference : 918-251-0090 29. 128 – Oregon Rule and Law Version 20231The electrical work permit fee for a manufactured dwelling unit (mobile home) ________. Is typically based on a service and feeder fee Is based on square footage Has a discount available for senior citizens Has a discount available for multiple units Reference : 918-309-0030(5) 30. 004 – Oregon Rule and Law Version 20231A registered signing supervising electrician shall provide direct supervision or control on a job by ________. All of these statements are true. Being on the job site Having a continuously employed full time supervising electrician on the job site Be available in person to meet with the inspector on the job site within 2 business days Reference : 918-282-0015 31. 147 – Oregon Rule and Law Version 20231When an electrical contractor using a master permit for a facility ceases to cover that location, the inspecting jurisdiction shall be notified by the permit holder within ________ of the termination. 10 days 5 days 14 days 30 days Reference : 918-309-0100(6) 32. 022 – Oregon Rule and Law Version 20231A dormitory in Oregon is considered a space in a building where group sleeping accommodations are provided in one or more closely associated rooms with up to _________ persons There is no designated count 12 16 10 Reference : Table 1-E, 100 33. 053 – Oregon Rule and Law Version 20231Ground-fault protection performance testing in a Health Care Facility shall be conducted by A person with proper training to evaluate the results A qualified person The manufacturer only A licensed journey-level electrician Reference : Table 1-E , 517.17(D) 34. 060 – Oregon Rule and Law Version 20231For a Natural and Artificially Made Body of Water, outlets supplied by branch circuits not exceeding ________ single phase, shall be provided with GFCI protection for personnel 60 amperes 30 amperes 20 amperes The State of Oregon has not adopted this NEC section Reference : Table 1-E , 682.2(A) 35. 112 – Oregon Rule and Law Version 20231In the State of Oregon, an electrical work permit is required ________. Prior to the start of the electrical work Before an inspection request Within 1 day of the start of the work Before the plan review process Reference : 918-309-000(3) 36. 116 – Oregon Rule and Law Version 20231Electrical work permits issued under the Oregon Specialty Code become null and void if the electrical work is not started within ________. 180 days 120 days 60 days 365 days Reference : 918-309-000(7) 37. 155 – Oregon Rule and Law Version 20231Generally, a limited energy contractor can use a limited minor electrical permit for a new installation of up to ________ in new construction. 10 devices 15 devices 20 devices 25 devices Reference : 918-309-0220(6) 38. 145 – Oregon Rule and Law Version 20231A master electrical permit shall only be provided to ________. All of these can utilize a master permit A facility operating manager A facility owner An electrical contractor Reference : 918-309-0100(5) 39. 107 – Oregon Rule and Law Version 20231Ground-Fault Circuit-Interrupter Protection (GFCI) for personnel was modified in the NEC to cover all receptacles for electric hand tools or portable lighting in work areas for welders. The Oregon amendments ________. Did not adopt this code section Requires GFCI protection for both 120 volt and 250 volt receptacles Only require GFCI protection for 250 volt receptacles Only require GFCI protection for 120 volt receptacles Reference : Table 1-E 630.8 40. 130 – Oregon Rule and Law Version 20231Bulk electrical permit labels are sold ________ at $25.00 per label Only to electrical contractors To anyone needing a permit To homeowners and low voltage electrical contractors Only to homeowners Reference : 918-309-0040(9) 41. 124 – Oregon Rule and Law Version 20231If an electrical contractor begins the electrical installation before a required plan review is completed ________. The permit purchaser proceeds at his or her own risk The license may be suspended There will be a fine assessed There will be a citation assessed Reference : 918-309-0025(1) 42. 036 – Oregon Rule and Law Version 20231Receptacle outlets shall be installed for a dwelling unit kitchen island At least 1 At least 2 One minimum at each end At least 1 for the first 9 square feet Reference : Table 1-E , 210.52(C)(2) 43. 057 – Oregon Rule and Law Version 20231In an elevator pit, sump pumps are required to be protected with Class A GFCI protection for personnel, unless ________. It is a single receptacle and labeled It is single-phase It is 3-phase There is also qualified personnel on site Reference : Table 1-E , 620.6(C) 44. 051 – Oregon Rule and Law Version 20231If electrical switchgear has been damaged by fire or water, it shall be evaluated by ________ prior to being returned to service The signing supervisor A licensed journey-level electrician A qualified testing laboratory only The manufacturer only Reference : Table 1-E , 490.49 45. 090 – Oregon Rule and Law Version 20231The 2023 NEC expanded the requirements for GFCI protection for appliances, the Oregon Specialty Code clarified GFCI protection for _________. Specific appliances 3 phase appliances only Single phase appliances only No appliances Reference : Table 1-E210.8(D) 46. 015 – Oregon Rule and Law Version 20231A licensed journey-level limited sign electrician may extend an existing dedicated sign branch circuit not more than ________ 15 feet 25 feet 10 feet Reference : 918-282-0220 47. 040 – Oregon Rule and Law Version 20231For dwelling units, an outdoor disconnect is required as an emergency disconnect. The disconnect can be a Service disconnect Listed disconnect switch Meter disconnect Oregon has not adopted this NEC section Reference : Table 1-E , 230.85 48. 098 – Oregon Rule and Law Version 20231The 2023 NEC additionally required barriers to cover the exposed energized bussing for service panelboards. The State of Oregon rules ________. Added an exception to service equipment with more than 1 disconnect in an enclosure Did not adopt these changes Additionally required a warning label Only recommended this requirement Reference : Table 1-E 230.62(C) 49. 069 – Oregon Rule and Law Version 20231For the purposes of electrical licensing, an Industrial Plant can include a ________. All of these statements are true Sewer Plant Hospital School Reference : 918-251-0090 50. 044 – Oregon Rule and Law Version 20231Receptacles shall not be installed within or above a bathtub, Or shower stall Or steam room Nor within 12 feet vertically Nor within 5 feet horizontally Reference : Table 1-E , 406.9(C) Back Save Progress Retry Finish