Oregon Rule and Law Version 2023 Quiz Please sign up for the before taking this quiz. Back Save Progress Retry Finish 1. 048 – Oregon Rule and Law Version 20231Stationary generators 600 volts and less Are not required to be listed Shall be listed Shall be identified only Need to be specifically approved by a supervisor Reference : Table 1-E , 445.6 2. 025 – Oregon Rule and Law Version 20231In the State of Oregon, all ________ 15 and 20 ampere receptacles installed in dwelling unit locations specified in 210.8(A)1-10 shall have GFCI protection for personnel. 125 volt single phase only 125 volt single phase through 208 volt 125 volt single phase through 250 volt 250 volt single phase Reference : Table 1-E, 210.8(A) 3. 107 – Oregon Rule and Law Version 20231Ground-Fault Circuit-Interrupter Protection (GFCI) for personnel was modified in the NEC to cover all receptacles for electric hand tools or portable lighting in work areas for welders. The Oregon amendments ________. Did not adopt this code section Requires GFCI protection for both 120 volt and 250 volt receptacles Only require GFCI protection for 250 volt receptacles Only require GFCI protection for 120 volt receptacles Reference : Table 1-E 630.8 4. 041 – Oregon Rule and Law Version 20231Conduits or raceways through which moisture may contact live parts shall be sealed At either or both ends At one end only At both ends With identified listed sealant for use Reference : Table 1-E, 300.5(G) 5. 137 – Oregon Rule and Law Version 20231A temporary electrical work permit must be signed by ________. The journeyman electrician doing the work The electrical AHJ inspecting the installation A technician only A supervising electrician only Reference : 918-309-0080(4) 6. 113 – Oregon Rule and Law Version 20231An electrical work permit shall be posted ________. In a conspicuous place near the panel or on the job site Near the main electrical panel In the electrical room On the main electrical panel Reference : 918-309-000(4) 7. 024 – Oregon Rule and Law Version 20231When doors are required to be equipped with panic hardware, the panic hardware for quick egress shall be ________. Listed in accordance with UL 305 Labeled Tested Tested monthly with the records kept Reference : Table 1-E, 110.26 (C)(3) 8. 009 – Oregon Rule and Law Version 20231________ is the only individual authorized to supervise the installation or alteration of an electrical service A general supervising electrician A general electrician A journey-level electrician The owner Reference : 918-282-0140 9. 097 – Oregon Rule and Law Version 20231The NEC allows service-entrance conductors to be spiced and tapped. Power distribution blocks and pressure connectors are required by the Oregon Rules to be ________. Listed Marked suitable for service Marked suitable for use on the line side Rated for a minimum of 60K IC Reference : Table 1-E 230.46 10. 006 – Oregon Rule and Law Version 20231Electrical licenses in Oregon are not required to install limited energy systems not exceeding ________ in Class 2 systems within a given list of items. 100 VA 24 VA 120 VA 500 VA Reference : 918-282-0110 11. 139 – Oregon Rule and Law Version 20231When notification to a jurisdiction of the use of a temporary electrical permit is faxed in, the original with payment must also be mailed in within ________. 5 days 4 days 3 days 2 days Reference : 918-309-0080(4) 12. 018 – Oregon Rule and Law Version 20231To become a general journey-level electrical apprentice in Oregon, All of these statements are true. You must have had some mathematics with a grade of C or better You must have a high school diploma You must be 17 years of age to apply Reference : 918-282-0270 13. 083 – Oregon Rule and Law Version 20231A change in the definition of servicing in the Oregon rules now includes the ________ of used equipment with listed or recognized components. (Also can be a factor when it comes to licensing compliance.) All of these items are now included Repair Testing Inspection Reference : Table 1-E 100 Definitions 14. 142 – Oregon Rule and Law Version 20231If the rules on temporary electrical work permits are violated, civil penalties may be assessed. The contractor may also be ________ from using these in the future. All of these statements are true Denied Restricted Suspended Reference : 918-309-0080(8) 15. 129 – Oregon Rule and Law Version 20231When an electrical service was disconnected for repairs, if a major violation of the service exists, ________. A new service and permit fee is required The corrections shall be completed with 30 days A citation shall be issued to the owner A citation shall be issued to the electrical contractor Reference : 918-309-0040(9) 16. 125 – Oregon Rule and Law Version 20231When an electrical work permit is purchased for a one-family dwelling, the permit purchaser is entitled to ________ inspections. 4 5 6 8 Reference : 918-309-0025(1) 17. 058 – Oregon Rule and Law Version 20231For a swimming pool, ________ shall be permitted to required periodic inspections and/or testing. The State of Oregon did not adopt this. The Chief Electrical Inspector The State of Oregon the Authority Having Jurisdiction Reference : Table 1-E , 680.4 18. 127 – Oregon Rule and Law Version 20231To calculate the fee for an electrical work permit for a one-family dwelling, ________. You must include the square footage of the garage if it is attached The attached garage is not included in this footprint A discount is available for senior citizens The Specialty Code does not clarify fees regarding garages Reference : 918-309-0030(5) 19. 152 – Oregon Rule and Law Version 20231A limited maintenance specialty contractor may use a minor electrical permit label for ________. A garbage disposal up to 20 amperes A dishwasher up to 30 amperes A fan up to 25 amperes A furnace up to 30 amperes Reference : 918-309-0220(5) 20. 034 – Oregon Rule and Law Version 20231In a dwelling unit, AFCI protection shall not be required for 120 volt, single phase, 15 and 20 ampere branch circuits supplying receptacles located in An area that serves an appliance that is fastened in place A pet wash location An area that could be considered a damp location that can cause unwanted tripping In any wet location Reference : Table 1-E , 210.12(B)ex 4 21. 054 – Oregon Rule and Law Version 20231In a place of assembly, illumination shall be required for working spaces around outdoor None of these statements are true. Switchgear Service equipment only Motor control centers Reference : Table 1-E , 518.6 22. 060 – Oregon Rule and Law Version 20231For a Natural and Artificially Made Body of Water, outlets supplied by branch circuits not exceeding ________ single phase, shall be provided with GFCI protection for personnel 60 amperes 30 amperes 20 amperes The State of Oregon has not adopted this NEC section Reference : Table 1-E , 682.2(A) 23. 154 – Oregon Rule and Law Version 20231A limited energy contractor can use a limited minor electrical permit for ________. Audio and stereo systems Any vacuum system not over 5 Security systems but only under 5 Fire alarms Reference : 918-309-0220(6) 24. 084 – Oregon Rule and Law Version 20231The 2023 NEC has now begun to address cybersecurity for network-connected life safety equipment. In Oregon the permit holder ________ demonstrate compliance with this requirement for this type of installation. Is not required to Shall not Is recommended to Is required to Reference : Table 1-E 110.3(A)(8) 25. 011 – Oregon Rule and Law Version 20231A limited supervising electrician may direct an electrical installation in an existing _________. Hospital Duplex Dwelling Unit Multifamily structure Reference : 918-282-0160 26. 092 – Oregon Rule and Law Version 20231The Oregon State rules also modified the 2023 NEC arc fault requirements for dormitory unit receptacles by additionally adding ________ areas. Study Outside Lobbies Parking Reference : Table 1-E 210.12(C) 27. 031 – Oregon Rule and Law Version 20231Generally, all outdoor ________ for other than dwelling units, that are supplied by single-phase branch circuits rated 150 volts to ground or less (50 amperes or less) shall have GFCI protection General purpose receptacles Outlets up to 8 feet above grade Outlets Dedicated circuits Reference : Table 1-E , 210.8(F) 28. 067 – Oregon Rule and Law Version 20231An electrical Engineer in Oregon is an individual who has completed a minimum ________ in electrical engineering or technology. 4 year program High voltage program NEC degree 2 year program Reference : 918-251-0090 29. 013 – Oregon Rule and Law Version 20231A licensed limited residential electrician can make electrical installations on multi-family dwelling units when not exceeding ________ floors above grade 3 10 4 2 Reference : 918-282-0180 30. 108 – Oregon Rule and Law Version 20231In an emergency system such as egress lighting, if the transfer switch is supplied by a single feeder, additional redundant transfer equipment is required by the NEC that is available so maintenance and repairs can take place. The Oregon amendments only require this if ________. The building owner deems it necessary The plan review requires it It is a public school It is a hospital Reference : Table 1-E 700.5 31. 064 – Oregon Rule and Law Version 20231When an electrical contractor has a person that is Continuously Employed, he or she devotes ________ of employment to the tasks such as supervising. Their entire time 0.5 0.25 0.75 Reference : 918-251-0090 32. 039 – Oregon Rule and Law Version 20231All services supplying ________ shall be provided with a Surge-Protective Device (SPD). Dwelling units Industrial applications Commercial structures Oregon has not adopted this NEC section. Reference : Table 1-E , 230.67 33. 089 – Oregon Rule and Law Version 20231The 2023 NEC added additional GFCI protection requirements for aquariums and bait wells. The Oregon rules modified with an exception if the device is installed ________ and a single receptacle is installed. Indoors Outdoors Above 5 feet Above 6 feet Reference : Table 1-E 210.8(B)ex7 34. 158 – Oregon Rule and Law Version 20231 A properly licensed electrical contractor may use a minor label permit for an altered electrical service that does not exceed ________ provided it is not required to be reconnected by the serving utility. 200 amps and 150 volts to ground 200 amps and 250 volts to ground 400 amps and 150 volts to ground 400 amps and 250 volts to ground Reference : 918-309-0220(7) 35. 088 – Oregon Rule and Law Version 20231The 2023 NEC defines a kitchen which includes an area with sinks and permanent provisions for food preparation. Th Oregon State rules Did not adopt this definition Expanded the definitions to outside wet bars Expanded the definition to include beverage preparation Have adopted the 2023 NEC definition Reference : Table 1-E 210.8(A) 36. 124 – Oregon Rule and Law Version 20231If an electrical contractor begins the electrical installation before a required plan review is completed ________. The permit purchaser proceeds at his or her own risk The license may be suspended There will be a fine assessed There will be a citation assessed Reference : 918-309-0025(1) 37. 105 – Oregon Rule and Law Version 20231The NEC does not allow reconditioned luminaires, ballasts, and LED drivers. The State of Oregon further clarifies that ________. Maintenance of luminaires is not considered reconditioning Maintenance of luminaires is considered reconditioning Servicing of luminaires is considered reconditioning Trouble shooting of luminaires is considered reconditioning Reference : Table 1-E 410.2 38. 070 – Oregon Rule and Law Version 20231In Oregon, a Jurisdictional Inspector can be a ________. State or municipal inspector Municipal inspector only State inspector only County inspector only Reference : 918-251-0090 39. 074 – Oregon Rule and Law Version 20231A Plug-in Replacement does not have ________ that is connected to the plug-in part or assembly. Any field wiring Any hard wiring Any software Any mechanical hardware Reference : 918-251-0090 40. 020 – Oregon Rule and Law Version 20231Existing electrical installations in Oregon that complied with previous National Electrical Code standards Are considered presently in violation of current codes if the use of the building is changed Are considered presently in violation of current codes May be considered in violation of current codes in all cases Will never be considered in violation of current codes Reference : 918-305-0000 41. 150 – Oregon Rule and Law Version 20231A minor electrical permit label may not be used for an installation ________. All of the statements are correct For a swimming pool That requires a plan review That requires a sheet rock cover inspection Reference : 918-309-0220(3) 42. 005 – Oregon Rule and Law Version 20231Electrical licenses in Oregon are not required to do testing of electrical products in _________. All of these statements are true. A recognized UL testing lab Industrial plants An electrical shop Reference : 918-282-0110 43. 138 – Oregon Rule and Law Version 20231A temporary electrical work permit has a starting date, and the ending date shall not be any more than ________ days from the starting date. 7 3 2 10 Reference : 918-309-0080(4) 44. 091 – Oregon Rule and Law Version 20231The Oregon State rules modified the 2023 NEC arc fault requirements for dormitory unit receptacles ________ areas. Similar room Living Rooms Closets Hallways Reference : Table 1-E 210.12(C) 45. 010 – Oregon Rule and Law Version 20231The general signing supervising electrician shall ________ Sign all permits Pay for all permits Fill out all permits Process all permits Reference : 918-282-0140 46. 101 – Oregon Rule and Law Version 20231The Oregon State Electrical Specialty Code amendments now allow Electrical Nonmetallic Tubing in buildings exceeding three floors above grad ________. If installed in accordance with Standard NFPA13 In commercial applications only When identified at the source panelboard Reference : Table 1-E 362.10 47. 087 – Oregon Rule and Law Version 20231The 2023 NEC clarified the general rules regarding identification of disconnecting means. Oregon additionally noted that the location of the circuit source information should include ________. A circuit number A room number An electrical room number Any description Reference : Table 1-E 110.22(A) 48. 033 – Oregon Rule and Law Version 20231In a dwelling unit, AFCI protection shall not be required for 120 volt, single phase, 15 and 20 ampere branch circuits supplying receptacles located in Locations with dedicated outlets that supply equipment known to cause unwanted tripping All of these statements are true Sunrooms with GFCI protection Living rooms with dedicated circuits Reference : Table 1-E , 210.12(B) ex 3 49. 077 – Oregon Rule and Law Version 20231There is an exemption from permits for the repair or replacement of an HVAC ________. Capacitor Flex whip Disconnect Branch Circuit Reference : 918-261-0020 50. 120 – Oregon Rule and Law Version 20231The Oregon Electrical Specialty Code does not require an electrical work permit for ________. Some minor electrical installations that can use a minor installation label Homeowners C.O.P. locations Any low voltage applications Reference : 918-309-000(10) Back Save Progress Retry Finish