Oregon Rule and Law Version 2023 Quiz Please sign up for the before taking this quiz. Back Save Progress Retry Finish 1. 026 – Oregon Rule and Law Version 20231In Oregon State, ________ in a dwelling unit are not required to have GFCI protection for all 125 volt, single phase, 15-20 ampere receptacles Kitchen receptacles that do not serve the countertop Laundry areas Garages Outdoors Reference : Table 1-E , 210.8(A)(6) 2. 034 – Oregon Rule and Law Version 20231In a dwelling unit, AFCI protection shall not be required for 120 volt, single phase, 15 and 20 ampere branch circuits supplying receptacles located in An area that serves an appliance that is fastened in place A pet wash location An area that could be considered a damp location that can cause unwanted tripping In any wet location Reference : Table 1-E , 210.12(B)ex 4 3. 023 – Oregon Rule and Law Version 20231An Alcove in the Oregon Specialty Electrical Code is additionally defined as an area with a ________. Depth of not less than 2 feet Depth of not less than 3 feet Length of not less than 4 feet Length of not less than 5 feet Reference : Table 1-E, 100 4. 074 – Oregon Rule and Law Version 20231A Plug-in Replacement does not have ________ that is connected to the plug-in part or assembly. Any field wiring Any hard wiring Any software Any mechanical hardware Reference : 918-251-0090 5. 048 – Oregon Rule and Law Version 20231Stationary generators 600 volts and less Are not required to be listed Shall be listed Shall be identified only Need to be specifically approved by a supervisor Reference : Table 1-E , 445.6 6. 058 – Oregon Rule and Law Version 20231For a swimming pool, ________ shall be permitted to required periodic inspections and/or testing. The State of Oregon did not adopt this. The Chief Electrical Inspector The State of Oregon the Authority Having Jurisdiction Reference : Table 1-E , 680.4 7. 068 – Oregon Rule and Law Version 20231An Indorsement determines the ________ of work authorized under a restricted electrical license. Scope Limitation Restriction Activity Reference : 918-251-0090 8. 131 – Oregon Rule and Law Version 20231Any person that commences and starts the electrical work before an electrical work permit is issued will be subject to ________. An investigative fee A license revocation A criminal fine A civil penalty Reference : 918-309-0070(12) 9. 158 – Oregon Rule and Law Version 20231 A properly licensed electrical contractor may use a minor label permit for an altered electrical service that does not exceed ________ provided it is not required to be reconnected by the serving utility. 200 amps and 150 volts to ground 200 amps and 250 volts to ground 400 amps and 150 volts to ground 400 amps and 250 volts to ground Reference : 918-309-0220(7) 10. 107 – Oregon Rule and Law Version 20231Ground-Fault Circuit-Interrupter Protection (GFCI) for personnel was modified in the NEC to cover all receptacles for electric hand tools or portable lighting in work areas for welders. The Oregon amendments ________. Did not adopt this code section Requires GFCI protection for both 120 volt and 250 volt receptacles Only require GFCI protection for 250 volt receptacles Only require GFCI protection for 120 volt receptacles Reference : Table 1-E 630.8 11. 030 – Oregon Rule and Law Version 20231A 125 volt, 20 ampere receptacle, installed inside a dwelling unit to service heating and air conditioning equipment is Not required to be GFCI protected unless required otherwise in the code Required to be GFCI protected Required to be installed within 60 feet of the unit Required to be installed with AFCI protection Reference : Table 1-E , 210.8(E) 12. 083 – Oregon Rule and Law Version 20231A change in the definition of servicing in the Oregon rules now includes the ________ of used equipment with listed or recognized components. (Also can be a factor when it comes to licensing compliance.) All of these items are now included Repair Testing Inspection Reference : Table 1-E 100 Definitions 13. 073 – Oregon Rule and Law Version 20231A Listed Product means a product that was examined and accepted by ________. An NRTL UL only ETL only CSA or ETL only Reference : 918-251-0090 14. 019 – Oregon Rule and Law Version 20231A general journey-level electrical 8,000 hour apprenticeship program in Oregon with at least ________ hours of on-the-job training may work under indirect supervision. 6500 6000 5000 7000 Reference : 918-282-0270 15. 157 – Oregon Rule and Law Version 20231A properly licensed electrical contractor may use a minor label permit for a circuit extension of not more than ________ electrical circuits limited to 30 amps and not more than 300 volts to ground. 1 2 3 4 Reference : 918-309-0220(7) 16. 103 – Oregon Rule and Law Version 20231A new general 2023 rules does not allow receptacle outlets within 3 feet of a dwelling unit bathtub or shower. A modified exception for a small bathroom in Oregon allows the receptacle to be installed ________. Outside the room To be eliminated On the farthest wall within the room Next to the toilet Reference : Table 1-E 406.9(C) 17. 140 – Oregon Rule and Law Version 20231When notification to a jurisdiction of the use of a temporary electrical permit is called in, the original with payment must also be mailed in within ________. 7 days 6 days 5 days 4 days Reference : 918-309-0080(4) 18. 010 – Oregon Rule and Law Version 20231The general signing supervising electrician shall ________ Sign all permits Pay for all permits Fill out all permits Process all permits Reference : 918-282-0140 19. 153 – Oregon Rule and Law Version 20231A limited maintenance specialty contractor can take advantage of a minor label electrical permit to replace up to ________ ballasts for light fixtures under one minor permit. 10 15 12 20 Reference : 918-309-0220(5) 20. 032 – Oregon Rule and Law Version 20231In a dwelling unit, AFCI protection shall not be required for 120 volt, single phase, 15 and 20 ampere branch circuits supplying receptacles located in All of these statements are true Hallways Laundry areas Kitchens Reference : Table 1-E , 210.12(B)ex 2 21. 049 – Oregon Rule and Law Version 20231Need to be specifically approved by a supervisor Now all of these are required in Oregon Shall meet the requirements of 445.19(A)(1) Shall be located outside Shall be accessible Reference : Table 1-E , 445.19(C) 22. 132 – Oregon Rule and Law Version 20231A stop-work order may only be issued for ________ violations of the minimum electrical safety standards. Permitted projects for Commercial only for Major Homeowner projects for Reference : 918-309-0075(2) 23. 152 – Oregon Rule and Law Version 20231A limited maintenance specialty contractor may use a minor electrical permit label for ________. A garbage disposal up to 20 amperes A dishwasher up to 30 amperes A fan up to 25 amperes A furnace up to 30 amperes Reference : 918-309-0220(5) 24. 045 – Oregon Rule and Law Version 20231In the State of Oregon, all 15 and 20 ampere, 125 volt, nonlocking type receptacles in _________ shall be listed as tamper-resistant receptacles Mobile homes Outdoor locations All locations Business offices Reference : Table 1-E , 406.12 25. 056 – Oregon Rule and Law Version 20231When an overcurrent device has been previously used for a temporary electrical service, to be re-installed, these devices shall ________. Have no evidence of impending failure Be examined by a licensed individual Be maintained by a qualified person Be tested monthly Reference : Table 1-E , 590.8(A) 26. 110 – Oregon Rule and Law Version 20231The 2023 required commissioning (initial testing) and documented maintenance of Energy Storage Systems. The Oregon rules ________. Did not adopt this requirement Recommend additional measures against cyber attacks Require the results to be sent and filed with the State Require a digital backup Reference : Table 1-E 706.7 27. 072 – Oregon Rule and Law Version 20231A Limited Energy System can mean a system that includes ________. All of these statements are true. An audio system A power limited fire alarm A communication system Reference : 918-251-0090 28. 095 – Oregon Rule and Law Version 20231Additional surge protection for feeders was a major change in the NEC. The State of Oregon ________. Does not require this Only requires this for dormitory units Only requires this for guest rooms in a hotel Only requires this for dwelling units Reference : Table 1-E 215.18 29. 044 – Oregon Rule and Law Version 20231Receptacles shall not be installed within or above a bathtub, Or shower stall Or steam room Nor within 12 feet vertically Nor within 5 feet horizontally Reference : Table 1-E , 406.9(C) 30. 081 – Oregon Rule and Law Version 20231In a new change to the Oregon amendments to the 2023 NEC, there now includes a clarification for the electrical datum plane (elevation) calculations for locations such as marinas. The electrical datum plane shall be determined in accordance with __________ codes. The Oregon Structural or Residential codes An electrical supervisor Each county jurisdiction The NEC 2020 edition Reference : Table 1-E 90.4(D) 31. 114 – Oregon Rule and Law Version 20231As a general rule, an electrical permit issued to one firm is ________ . Not transferable Transferable only on commercial projects Transferable when one firm does the branch circuits and the other does the service Transferable to another if the first has filed for bankruptcy Reference : 918-309-000(5) 32. 013 – Oregon Rule and Law Version 20231A licensed limited residential electrician can make electrical installations on multi-family dwelling units when not exceeding ________ floors above grade 3 10 4 2 Reference : 918-282-0180 33. 089 – Oregon Rule and Law Version 20231The 2023 NEC added additional GFCI protection requirements for aquariums and bait wells. The Oregon rules modified with an exception if the device is installed ________ and a single receptacle is installed. Indoors Outdoors Above 5 feet Above 6 feet Reference : Table 1-E 210.8(B)ex7 34. 088 – Oregon Rule and Law Version 20231The 2023 NEC defines a kitchen which includes an area with sinks and permanent provisions for food preparation. Th Oregon State rules Did not adopt this definition Expanded the definitions to outside wet bars Expanded the definition to include beverage preparation Have adopted the 2023 NEC definition Reference : Table 1-E 210.8(A) 35. 105 – Oregon Rule and Law Version 20231The NEC does not allow reconditioned luminaires, ballasts, and LED drivers. The State of Oregon further clarifies that ________. Maintenance of luminaires is not considered reconditioning Maintenance of luminaires is considered reconditioning Servicing of luminaires is considered reconditioning Trouble shooting of luminaires is considered reconditioning Reference : Table 1-E 410.2 36. 154 – Oregon Rule and Law Version 20231A limited energy contractor can use a limited minor electrical permit for ________. Audio and stereo systems Any vacuum system not over 5 Security systems but only under 5 Fire alarms Reference : 918-309-0220(6) 37. 011 – Oregon Rule and Law Version 20231A limited supervising electrician may direct an electrical installation in an existing _________. Hospital Duplex Dwelling Unit Multifamily structure Reference : 918-282-0160 38. 007 – Oregon Rule and Law Version 20231An owner of a facility having electrical employees ________ to the division the names and license numbers of limited supervising or limited maintenance electricians employed. Shall report in writing Shall report in writing twice a year Does not have to report Can report Reference : 918-282-0120 39. 148 – Oregon Rule and Law Version 20231Records required when a master annual permit is used also include ________. The license number of the person doing the work The materials list used to complete the alteration Any anticipated future projects A one line diagram of the changes Reference : 918-309-0100(6) 40. 002 – Oregon Rule and Law Version 20231Minor labels sold by the division for electrical installations shall be sold ___________. In lots of 10 In lots of 20 In lots of 50 One at a time Reference : 918-100-0030 41. 067 – Oregon Rule and Law Version 20231An electrical Engineer in Oregon is an individual who has completed a minimum ________ in electrical engineering or technology. 4 year program High voltage program NEC degree 2 year program Reference : 918-251-0090 42. 079 – Oregon Rule and Law Version 20231An example of the exemption for underground electrical transmission lines from permits and licensing is when the equipment is owned and operated by ________. A municipality A hospital A county A school Reference : 918-261-0030 43. 062 – Oregon Rule and Law Version 20231The definition of Appliance, in regards to the limited maintenance specialty contractor license, does not include Generally Deep frying equipment Clothes washing equipment Food mixing equipment Reference : 918-251-0090 44. 031 – Oregon Rule and Law Version 20231Generally, all outdoor ________ for other than dwelling units, that are supplied by single-phase branch circuits rated 150 volts to ground or less (50 amperes or less) shall have GFCI protection General purpose receptacles Outlets up to 8 feet above grade Outlets Dedicated circuits Reference : Table 1-E , 210.8(F) 45. 085 – Oregon Rule and Law Version 20231The 2023 NEC addressed servicing and preventive maintenance with used electrical equipment adding requirements. In Oregon ________. Repairs are permitted without additional requirements It shall be approved by the AHJ prior to the work The repairs shall be designed by an electrical engineer Only testing is approved Reference : Table 1-E 110.17 46. 046 – Oregon Rule and Law Version 20231If electrical equipment has been damaged by fire or water, it shall be evaluated by _______ prior to being returned to service. The signing supervisor A licensed journey-level electrician A qualified testing laboratory only The manufacturer only Reference : Table 1-E , 408.9(B) 47. 102 – Oregon Rule and Law Version 20231A modification to the 2023 NEC rules that require all receptacles to be rated as suitable for damp locations in Oregon applies to ________. All 125 volt nonlocking receptacles All 125 and 250 volt nonlocking receptacles All 125 through 277 volt nonlocking receptacles All 123 through 480 volt nonlocking receptacles Reference : Table 1-E 406.9(A) 48. 086 – Oregon Rule and Law Version 20231A new alterative method from the 2023 NEC to recondition and restore electrical equipment in Oregon is to use replacement parts ________. Selected by the supervising electrician Designed by any engineer By the manufacturer only Selected by the electrical inspector Reference : Table 1-E 110.20 49. 149 – Oregon Rule and Law Version 20231 A minor permit label in Oregon is an alternative option for smaller installations instead of a standard electrical permit. A minor label may be used for ________. Underground electrical installations Any circuit extension Burglar or security alarms Hot water heaters Reference : 918-309-0220(3) 50. 008 – Oregon Rule and Law Version 20231When a general supervising electrician is working for an electrical contractor, he/she may design, plan, and lay out work for ________. The customers of the contractor he/she is working for Any installation within his/her electrical scope Any installation if he/she is an engineer Only for altered electrical services Reference : 918-282-0140 Back Save Progress Retry Finish