Oregon Rule and Law Version 2023 Quiz Please sign up for the before taking this quiz. Back Save Progress Retry Finish 1. 160 – Oregon Rule and Law Version 20231Renewable Electrical Energy Bulk Labels may be purchased by ________. A general contractor The property owner only A limited renewable energy contractor only Any licensed electrician Reference : 918-309-0410(1) 2. 159 – Oregon Rule and Law Version 20231The misuse and violations of minor installation label rules ________. Are subject to civil penalties Shall result in civil penalties not to exceed 250 dollars Shall result in a license suspension Shall result in a license revocation Reference : 918-309-0260 3. 158 – Oregon Rule and Law Version 20231 A properly licensed electrical contractor may use a minor label permit for an altered electrical service that does not exceed ________ provided it is not required to be reconnected by the serving utility. 200 amps and 150 volts to ground 200 amps and 250 volts to ground 400 amps and 150 volts to ground 400 amps and 250 volts to ground Reference : 918-309-0220(7) 4. 157 – Oregon Rule and Law Version 20231A properly licensed electrical contractor may use a minor label permit for a circuit extension of not more than ________ electrical circuits limited to 30 amps and not more than 300 volts to ground. 1 2 3 4 Reference : 918-309-0220(7) 5. 156 – Oregon Rule and Law Version 20231A properly licensed electrical contractor may use a minor label permit for a circuit extension of not more than ________ electrical circuits limited to 60 amps and not more than 150 volts to ground. 3 2 1 4 Reference : 918-309-0220(7) 6. 155 – Oregon Rule and Law Version 20231Generally, a limited energy contractor can use a limited minor electrical permit for a new installation of up to ________ in new construction. 10 devices 15 devices 20 devices 25 devices Reference : 918-309-0220(6) 7. 154 – Oregon Rule and Law Version 20231A limited energy contractor can use a limited minor electrical permit for ________. Audio and stereo systems Any vacuum system not over 5 Security systems but only under 5 Fire alarms Reference : 918-309-0220(6) 8. 153 – Oregon Rule and Law Version 20231A limited maintenance specialty contractor can take advantage of a minor label electrical permit to replace up to ________ ballasts for light fixtures under one minor permit. 10 15 12 20 Reference : 918-309-0220(5) 9. 152 – Oregon Rule and Law Version 20231A limited maintenance specialty contractor may use a minor electrical permit label for ________. A garbage disposal up to 20 amperes A dishwasher up to 30 amperes A fan up to 25 amperes A furnace up to 30 amperes Reference : 918-309-0220(5) 10. 151 – Oregon Rule and Law Version 20231A limited maintenance specialty HVAC/R contractor may use a minor electrical permit label if the single phase installation does not exceed ________. 150 volts to ground 208 volts to ground 240 volts to ground 250 volts to ground Reference : 918-309-0220(5) 11. 150 – Oregon Rule and Law Version 20231A minor electrical permit label may not be used for an installation ________. All of the statements are correct For a swimming pool That requires a plan review That requires a sheet rock cover inspection Reference : 918-309-0220(3) 12. 149 – Oregon Rule and Law Version 20231 A minor permit label in Oregon is an alternative option for smaller installations instead of a standard electrical permit. A minor label may be used for ________. Underground electrical installations Any circuit extension Burglar or security alarms Hot water heaters Reference : 918-309-0220(3) 13. 148 – Oregon Rule and Law Version 20231Records required when a master annual permit is used also include ________. The license number of the person doing the work The materials list used to complete the alteration Any anticipated future projects A one line diagram of the changes Reference : 918-309-0100(6) 14. 147 – Oregon Rule and Law Version 20231When an electrical contractor using a master permit for a facility ceases to cover that location, the inspecting jurisdiction shall be notified by the permit holder within ________ of the termination. 10 days 5 days 14 days 30 days Reference : 918-309-0100(6) 15. 146 – Oregon Rule and Law Version 20231A covered facility can obtain and use a master electrical permit only if ________. Licensed electricians do the work The facility has used these permits before The facility is over 10 They agree to have progress inspections once a month Reference : 918-309-0100(5) 16. 145 – Oregon Rule and Law Version 20231A master electrical permit shall only be provided to ________. All of these can utilize a master permit A facility operating manager A facility owner An electrical contractor Reference : 918-309-0100(5) 17. 144 – Oregon Rule and Law Version 20231A master electrical permit covers ________ electrical installations Alterations of Structural retrofits New building shells A small increase in square footage Reference : 918-309-0100(4) 18. 143 – Oregon Rule and Law Version 20231A master electrical work permit is used by industrial plants and governmental entities. A master permit is ________. An annual permit Valid for 6 months before expiration Valid for another year after the last inspection Remains active until canceled Reference : 918-309-0100(2) 19. 142 – Oregon Rule and Law Version 20231If the rules on temporary electrical work permits are violated, civil penalties may be assessed. The contractor may also be ________ from using these in the future. All of these statements are true Denied Restricted Suspended Reference : 918-309-0080(8) 20. 141 – Oregon Rule and Law Version 20231An inspection for a temporary electrical work permit shall be requested ________. At any time following the permit procedure Within 1 week of completion Within 48 hours of completion Within 24 hours of completion Reference : 918-309-0080(6) 21. 140 – Oregon Rule and Law Version 20231When notification to a jurisdiction of the use of a temporary electrical permit is called in, the original with payment must also be mailed in within ________. 7 days 6 days 5 days 4 days Reference : 918-309-0080(4) 22. 139 – Oregon Rule and Law Version 20231When notification to a jurisdiction of the use of a temporary electrical permit is faxed in, the original with payment must also be mailed in within ________. 5 days 4 days 3 days 2 days Reference : 918-309-0080(4) 23. 138 – Oregon Rule and Law Version 20231A temporary electrical work permit has a starting date, and the ending date shall not be any more than ________ days from the starting date. 7 3 2 10 Reference : 918-309-0080(4) 24. 137 – Oregon Rule and Law Version 20231A temporary electrical work permit must be signed by ________. The journeyman electrician doing the work The electrical AHJ inspecting the installation A technician only A supervising electrician only Reference : 918-309-0080(4) 25. 136 – Oregon Rule and Law Version 20231When using a temporary permit, the contractor must also fill out a standard form electrical permit application ________. Prior to commencing the work After the work is completed Within 48 hours of commencing the work Within 24 hours of commencing the work Reference : 918-309-0080(4) 26. 135 – Oregon Rule and Law Version 20231Temporary electrical work permits can be used for ________. Unanticipated electrical work Any provisional work in hazardous locations only And by homeowners Small installations so that no electrical permit is needed also Reference : 918-309-0075(2) 27. 134 – Oregon Rule and Law Version 20231When it comes to a temporary electrical work permit, emergency electrical work is considered unplanned electrical repairs or replacements involving ________. An existing electrical installation An existing residential application only An existing commercial application only A new installation Reference : 918-309-0075(2) 28. 133 – Oregon Rule and Law Version 20231The Oregon Electrical Specialty Code allows ________ to purchase and use temporary electrical work permits. Licensed electrical contractors only General contractors for construction temporaries Any supervisor electrician Any technician Reference : 918-309-0080(1) 29. 132 – Oregon Rule and Law Version 20231A stop-work order may only be issued for ________ violations of the minimum electrical safety standards. Permitted projects for Commercial only for Major Homeowner projects for Reference : 918-309-0075(2) 30. 131 – Oregon Rule and Law Version 20231Any person that commences and starts the electrical work before an electrical work permit is issued will be subject to ________. An investigative fee A license revocation A criminal fine A civil penalty Reference : 918-309-0070(12) 31. 130 – Oregon Rule and Law Version 20231Bulk electrical permit labels are sold ________ at $25.00 per label Only to electrical contractors To anyone needing a permit To homeowners and low voltage electrical contractors Only to homeowners Reference : 918-309-0040(9) 32. 129 – Oregon Rule and Law Version 20231When an electrical service was disconnected for repairs, if a major violation of the service exists, ________. A new service and permit fee is required The corrections shall be completed with 30 days A citation shall be issued to the owner A citation shall be issued to the electrical contractor Reference : 918-309-0040(9) 33. 128 – Oregon Rule and Law Version 20231The electrical work permit fee for a manufactured dwelling unit (mobile home) ________. Is typically based on a service and feeder fee Is based on square footage Has a discount available for senior citizens Has a discount available for multiple units Reference : 918-309-0030(5) 34. 127 – Oregon Rule and Law Version 20231To calculate the fee for an electrical work permit for a one-family dwelling, ________. You must include the square footage of the garage if it is attached The attached garage is not included in this footprint A discount is available for senior citizens The Specialty Code does not clarify fees regarding garages Reference : 918-309-0030(5) 35. 126 – Oregon Rule and Law Version 20231When an electrical work permit is purchased for a two family dwelling unit, the permit purchaser is entitled to _________ inspections. 8 9 10 12 Reference : 918-309-0025(1) 36. 125 – Oregon Rule and Law Version 20231When an electrical work permit is purchased for a one-family dwelling, the permit purchaser is entitled to ________ inspections. 4 5 6 8 Reference : 918-309-0025(1) 37. 124 – Oregon Rule and Law Version 20231If an electrical contractor begins the electrical installation before a required plan review is completed ________. The permit purchaser proceeds at his or her own risk The license may be suspended There will be a fine assessed There will be a citation assessed Reference : 918-309-0025(1) 38. 123 – Oregon Rule and Law Version 20231When an electrical contractor has a job that requires a state plan review process, _________. A partial permit may be purchased so work can begin An outside firm can be hired to complete the review They can only begin with express consent from the chief They can not begin any work until the process is completed Reference : 918-309-0025(1) 39. 122 – Oregon Rule and Law Version 20231When an electrical permit is purchased, the permit purchaser is entitled to at least _________. 2 inspections 1 in person and 1 electronic inspection only 3 electronic inspections 3 in person inspections Reference : 918-309-000(11) 40. 121 – Oregon Rule and Law Version 20231The Oregon Electrical Specialty Code does not require an electrical permit for ________. A 30 ampere single phase dishwasher A 50 ampere electric water heater Any appliance Any garbage disposal Reference : 918-309-000(10) 41. 120 – Oregon Rule and Law Version 20231The Oregon Electrical Specialty Code does not require an electrical work permit for ________. Some minor electrical installations that can use a minor installation label Homeowners C.O.P. locations Any low voltage applications Reference : 918-309-000(10) 42. 119 – Oregon Rule and Law Version 20231The Oregon Electrical Specialty Code does not require any type of an electrical work permit for Replacing fuses Changing luminaire ballasts Changing luminaire drivers Replacing receptacles and switches Reference : 918-309-000(10) 43. 118 – Oregon Rule and Law Version 20231When corrections have been issued to a permitted electrical installation, those corrections must be completed within ________ of the notification. 20 days 15 days 30 days 60 days with extensions Reference : 918-309-000(8) 44. 117 – Oregon Rule and Law Version 20231Electrical work permits issued under the Oregon Specialty Code become null and void if the electrical work has been suspended or abandoned for a period of _________. 180 days 120 days 60 days 365 days Reference : 918-309-000(7) 45. 116 – Oregon Rule and Law Version 20231Electrical work permits issued under the Oregon Specialty Code become null and void if the electrical work is not started within ________. 180 days 120 days 60 days 365 days Reference : 918-309-000(7) 46. 115 – Oregon Rule and Law Version 20231An unexpired permit holder ________ for an extension of time within which work may be completed. May apply Of a residential project only may apply Of a commercial project only may apply May not apply Reference : 918-309-000(6) 47. 114 – Oregon Rule and Law Version 20231As a general rule, an electrical permit issued to one firm is ________ . Not transferable Transferable only on commercial projects Transferable when one firm does the branch circuits and the other does the service Transferable to another if the first has filed for bankruptcy Reference : 918-309-000(5) 48. 113 – Oregon Rule and Law Version 20231An electrical work permit shall be posted ________. In a conspicuous place near the panel or on the job site Near the main electrical panel In the electrical room On the main electrical panel Reference : 918-309-000(4) 49. 112 – Oregon Rule and Law Version 20231In the State of Oregon, an electrical work permit is required ________. Prior to the start of the electrical work Before an inspection request Within 1 day of the start of the work Before the plan review process Reference : 918-309-000(3) 50. 111 – Oregon Rule and Law Version 20231When purchasing an electrical permit for the State of Oregon, the signature of ________ is required on each permit. A signing supervising electrician The site owner The building owner The electrical contractor Reference : 918-309-000(1) Back Save Progress Retry Finish