2026 Changes Part 1- OR Quiz Please sign up for the before taking this quiz. Back Save Progress Retry Finish 1. 58 – 2026 Changes Part 11The NEC created a new code section for branch circuits over 1000 volts AC that allows conductor sizing to be determined by other than the NEC tables if the installation is __________. (This acknowledges that these can be complicated systems requiring flexibility.) Based on temperature rise Located outdoors In a campus environment Provided under engineering supervision Reference:265.19 B 2. 59 – 2026 Changes Part 11For branch circuits over 1000 volts AC, Medium Voltage equipment shall be rated not less than ________ of the sum of all loads. (In contrast to the 80% default load rating used in low voltage applications.) 125 percent 100 percent 110 percent 90 percent Reference:265.20 A 3. 6 – 2026 Changes Part 11An exception for Ground-Fault Circuit-Interrupter Protection (GFCI) requirements for an industrial establishment requires _________. (The electrical industry has been complaining about overapplication of GFCI requirements; this revision reflects that.) As Assured Equipment Grounding Conductor Program (AEGCP) Supervision and only qualified personnel These are all requirements for a GFCI exception. Equipment design not compatible with GFCI protection Reference:210.8 B ex 2 4. 144 – 2026 Changes Part 11According to 2026 NEC which of the following must be grounded in stationary battery installations?(This update clarifies outdated text by adding clear requirements That are very actionable :All conductive battery rack stands cabinets and cases must be grounded) nly metallic battery terminals Conductive battery stands Only battery chargers associated with the system Only battery enclosures located outdoors Reference:480.8 5. 164 – 2026 Changes Part 11According to the 2026 NEC, reconditioned equipment permitted to be installed in Zone?classified locations shall comply with the requirements of __________. . 500.8 only Article 430 Part IV 501.3 and 505.3 501.10(A)(1) only Reference:513.3 A 6. 67 – 2026 Changes Part 11A new NEC section identifies conductors that are considered damaged and now would require replacement including _________. (This damage can compromise insulation ratings and cause short circuits.) Smoke damage Aged over 50 years Severe cold Water damage Reference:300.4 C 7. 70 – 2026 Changes Part 11The requirement to maintain a 1 1/2 inch spacing from a roof decking for cables, raceways, and boxes now includes a decking poured with light weight concrete at least ______. (It is common during roofing repairs or replacement to use long screws that can penetrate wiring methods.) 2 inches thick 1 inch thick 1 1/2 inch thick 1 3/4 inch thick Reference:300.6 E 8. 81 – 2026 Changes Part 11Chapter 3 addresses maximum box fill and has been revised stating ________ are not included in box fill calculations. (This now officialy clarified this long-debated issue because they physically occupied space in the box.) Wire nuts (splicing connectors) Terminal blocks Internal cable clamps Equipment grounding conductors Reference:314.16 B 9. 193 – 2026 Changes Part 11Which of the following equipment used in motion picture and television studios and remote locations is REQUIRED to be listed under Article 530?(These listing requirements ensure that all portable power and lighting equipment used in production environments meets tested safety standards, especially where temporary wiring, high?intensity lighting, and rapid setup/teardown create elevated hazards.) Only generators rated over 15 kW Only equipment installed in permanent studio structures Only luminaires used for egress lighting Alternating?current power distribution boxes Reference:530.2 10. 159 – 2026 Changes Part 11Modification of luminaires using retrofit kits is permitted only when the retrofit kit is __________. Installed by a qualified person and approved by the manufacturer Listed for the location and listed for field installation with the luminaire being retrofitted Installed in accordance with Article 410 only Marked suitable for damp locations Reference:501.130 C 11. 52 – 2026 Changes Part 11A grounding electrode conductor ________ through ventilation, mounting slots, or weep holes of an enclosure like a transformer. (To address a common misapplication in the field risking mechanical damage to the GEC, affecting water drainage, and GEC support.) Can be installed Shall not be installed Can be installed with AHJ guidance Can be installed if the enclosure is indoors Reference:250.64 G 12. 186 – 2026 Changes Part 11Article 525 of the 2026 NEC covers the installation of portable wiring and equipment for which of the following?( Revised article 525 clarify the requirements for temporary power systems in entertainment settings these changes are not only editorial but structural making the article easier to navigate implement and enforce in high risk venues ware public safety is essential) Industrial manufacturing plants Permanent theatrical stages only Commercial amusement parks with permanent rides Carnivals Reference:525.1 13. 55 – 2026 Changes Part 11A new NEC section now covers the method required to establish an effective ground fault path when installing a nonmetallic enclosure with metallic raceways. Generally, ________ metallic wiring method shall have bonding jumpers or fitting. (Although uncommon, there are specially designed and listed nonmetallic enclosures with built in metal bonding.) It is recommended that at least 1 conduit A minimum of two conduits Each A minimum of one conduit Reference:250.109 B2 14. 176 – 2026 Changes Part 11A sign must be placed at the service?entrance equipment indicating the type and location of each on?site power source. Which of the following is exempt from this signage requirement? Battery?equipped emergency luminaires . Battery?equipped emergency luminaires Energy storage systems Reference:517.28 A ex. 15. 60 – 2026 Changes Part 11For branch circuits over 1000 volts AC that can require servicing, a 125 volt single phase 15- or 20-ampere receptacle outlet shall be available __________. (Generally the receptacle shall not be powered from the load side of the equipment.) Unless the system is supervised Within the same room or area Unless the system is in an isolated area Unless the system is outdoors Reference:265.63 B 16. 154 – 2026 Changes Part 11The 2026 NEC requires which of the following bonding methods for normally noncurrent?carrying metal parts of electrical equipment, raceways, metal?clad cable, and metal enclosures in hazardous classified locations? Any mechanical connection Threaded couplings/hubs made up wrench?tight Only wire?type equipment grounding conductors installed in every raceway Bonding is not required if the system voltage is under 50 volts Reference:500.3 17. 27 – 2026 Changes Part 11Outside feeders to one- and two-family dwelling units required a disconnect and an emergency disconnect, a clarification states ______. (Meant to reduce added costs and complexity with simple structures like residential workshops and detached garages.) Only one is needed if it complies with 225.41 Both disconnects shall be installed The disconnects shall be installed inside out of the weather An emergency disconnecting means is no longer required Reference:225.31 A, 4 1 18. 195 – 2026 Changes Part 11Which of the following is REQUIRED for bonding an equipotential plane under NEC 547?(This change makes it clear and enforceable standard for constructing equipped potential planes in agricultural environments ) It must be bonded to the grounding electrode system or an equipment grounding terminal using a solid copper conductor not smaller than #8 AWG It must be bonded with a #12 copper conductor to any nearby metal object It may be bonded with aluminum conductors if not subject to corrosion It must be connected only to the service neutral Reference:547.44 B 19. 7 – 2026 Changes Part 11As a general rule, in dwelling units, outdoor circuits rated at 150 volts or less to ground require GFCI protection for __________. (This increase addresses the trend for larger HVAC units now being installed in residential applications.) 70 amperes or less 80 amperes or less 100 amperes or less 60 amperes or less Reference:210.8 F 20. 104 – 2026 Changes Part 11 When using reconditioned switches, not all types are permitted to be installed. Which one is not permitted under the 2026 National Electrical Code?(General‑use snap switches fall under the category of wiring devices, and the NEC explicitly prohibits reconditioning of wiring devices ) Automatic transfer switches Manual bypass/isolation switches Molded-case switches (Breaker type switches) Transfer switches Reference:404.3 B 21. 1 – 2026 Changes Part 11A new list item now permits grounded neutral conductors sized 6 AWG and smaller with white or gray insulation to have a ________. (This should help match a neutral to the corresponding phase conductors in a raceway with other conductors. ( This has already been done in other countries.) Color painted on Double stripe Single colored stripe other than green Green colored stripe Reference:200.7 A 22. 115 – 2026 Changes Part 11 Receptacles shall not be installed in a face‑up position in which of the following locations? (The NEC prohibits installing receptacles face‑up on work surfaces because liquids can spill directly into the device,debris can fall into the openings and It creates a shock and contamination hazard) On work surfaces In a laundry area Under raised floors in IT rooms On walls adjacent to countertops Reference:406.14 G 23. 73 – 2026 Changes Part 11When raceways are installed in a wet location above grade level they now shall _______. (Moisture accumulation can be an issue in environments such as food processing plants, car washes, and swimming pools.) Be nonmetallic Have drip loops Use listed fittings that prevent condensation Be designed to drain Reference:300.11 B 24. 162 – 2026 Changes Part 11Cannabis extraction operations shall NOT be located in any building containing which of the following occupancies? Industrial or storage occupancies only Assembly Business occupancies only Mercantile occupancies only Reference:512.6 25. 183 – 2026 Changes Part 11The Essential Electrical System (EES) shall be divided into which branches, and where shall the division occur when more than one transfer switch is required? (The 2026 NEC edition this section’s title was updated to essential electrical systems and the terms nursing home and limited care faculties were removed the title now better reflects its content ) Critical branch and equipment branch; division occurs at the panelboards Critical branch and delayed?automatic branch; division occurs at the generator terminals Life safety branch and equipment branch; division occurs at the transfer switches Life safety branch and critical branch; division occurs at the service disconnect Reference:517.42 A 26. 137 – 2026 Changes Part 11If overcurrent protection is not provided at the generator, conductors from generator to the first overcurrent protective device must have an ampacity of at least_________. (This requirement accounts for possible operational overloads or transient surges ) 115 percent 100 percent 125 percent None of these answers are correct except this one Reference:445.13 27. 90 – 2026 Changes Part 11Nonmetallic-Sheathed Cable (Types NM and NMC, Romex) now requires listed products such as _______ be used during installation. (One of the most widely used wiring methods can be damaged by sharp edges or improper sizing.) Hangers only 2 hole straps only Straps only Staples Reference:334.2 28. 198 – 2026 Changes Part 11Outdoor receptacle outlets installed on mobile or manufactured homes must now comply with which NEC section?(Again this section is now in alignment with the requirements for stick built homes ) 210.52 550.13 only 406.9 300.5 Reference:550.13 D 29. 11 – 2026 Changes Part 11Branch-circuit disconnecting means rated 1000 amperes or more, solidly grounded, but not exceeding ____ volts line to line now mandates GFCI protection even for DC systems. (The NEC is trying to keep up with the increased usage of DC power such as in data centers, EV charging, energy storage systems, and large scale solar.) 1500 2000 2500 2400 Reference:210.13 A&B 30. 146 – 2026 Changes Part 11 According to the 2026 NEC which of the following correctly describes the new listing requirements and effective dates for high?voltage switchgear and industrial control assemblies? Equipment rated not over 15,000 volts must be listed by January 1, 2029, and equipment rated over 15,000 volts up to 52,000 volts must be listed by January 1, 2032 Only equipment over 52,000 volts must be listed, effective January 1, 2032 Only equipment over 52,000 volts must be listed, effective January 1, 2027 Reference:495.2 AB 31. 100 – 2026 Changes Part 11Terminology for Low-Voltage Suspended Ceiling Power Distribution Systems was replaced, now requiring that all components shall be _________. (Careful installation is needed to avoid damage or fire risks for these increasingly common systems.) Installed by qualified persons Inspected annually by a third party Inspected by a third party again after installation Installed in a neat and workman-like manner Reference:393.14 A 32. 127 – 2026 Changes Part 11Conductive pavement heating systems shall be designed as which of the following? Site?specific engineered designs by both civil and electrical engineers Standard off?the?shelf listed assemblies Field?assembled systems supervised by the installer shall have a plan review Reference:426.64 33. 93 – 2026 Changes Part 11There was a change for Service Entrance Cables (SE and USE) to allow relief for flat cables when bent on the flat side of the cable. _______________. (these flat versions are very common in residential applications.) Three times the minor diameter dimension is allowed. Five times the major diameter dimension can be used. Three times the major diameter dimension is recommended. Five times the minor diameter dimension can be used. Reference:338.24 34. 18 – 2026 Changes Part 11A change in determining the required receptacle outlet placement in dwelling units was a revision to exclude _________ from the wall space measurements. (The purpose was to reduce the overuse of extension cords. This should simplify the task of laying out receptacle outlet locations in the home.) Only fixed cabinets with a work surface Only fixed cabinets with countertops Any fixed cabinet Only fixed cabinets that are not recessed Reference:210.52 A2(1) 35. 171 – 2026 Changes Part 11Part II of Article 517 applies to which of the following? Only facilities with essential electrical systems Only Category 1 and Category 2 treatment rooms Only hospitals and ambulatory surgical centers Patient care spaces of all healthcare facilities Reference:517.10 A 36. 158 – 2026 Changes Part 11In Class I, Division 1 locations, one or more of the wiring methods in__________ shall be used in accordance with the requirements of the sections in the reference column and with the respective wiring?method requirements applied. For example, Type P cable is permitted only in __________ industrial establishments.(This update puts the code into table form for improve usability enabling installers to more clearly determine which wiring methods are allowed ) table 501.10 A 1. & Restricted Ordinary Temporary Commercial Reference:501.1 37. 30 – 2026 Changes Part 11Service equipment beyond what is specified in 230.2 A shall be _______. (With the changing times, service equipment may need to be modified or custom-built in the field.) Listed or field evaluated Listed as suitable for service only Field evaluated only Additionally certified Reference:230.2 B 38. 179 – 2026 Changes Part 11Power sources for the Essential Electrical System (EES) shall be one or more of the following: (These updates ensure that both on site and off site power sources are designed for sufficient reliability to support the faculties emergency operation plan ) Only on?site generators listed for emergency systems Photovoltaic systems Generating units Any power source approved by the authority having jurisdiction Reference:517.30 B 39. 69 – 2026 Changes Part 11Generally, wiring methods and materials installed under ________ has been revised and still must maintain a separation of no less than 1 1/2 inch from the roof decking. (This section was also re-written in the 2023 NEC.) Any wood decking only A plywood-type roof decking only A metal-corrugated roof decking only All types of roof decking Reference:300.6 E 40. 129 – 2026 Changes Part 11Fixed outdoor electric deicing and snow?melting equipment includes which of the following? Only factory?assembled heating systems Only embedded concrete heating mats Conductive pavement heating systems . Only roof?mounted heating cables Reference:Article 424, 425, 426 and 427 41. 109 – 2026 Changes Part 11 According to the NEC, which of the following statements about reconditioned wiring devices is correct?(Wiring devices cannot be reconditioned because they’re inexpensive are safety critical have internal components that cannot be inspected and are not designed for refurbishment ) Reconditioned wiring devices are permitted if tested by a qualified person Reconditioned wiring devices are not permitted to be used Reconditioned wiring devices are permitted if listed by a third‑party refurbisher Reconditioned wiring devices are permitted only in non‑dwelling occupancies Reference:406.3 42. 29 – 2026 Changes Part 11The NEC requirement to list service equipment as suitable as service has been consolidated into a list format and now includes _________. (An increasing emphasis on listing ensuring product safety through third party certification. AVTs are used to verify that circuits are de-energized.) Permanently mounted absence of voltage testers (AVTs) Power distribution blocks only Utility power company owned transfer switches All meter sockets Reference:230.2 A 43. 180 – 2026 Changes Part 11An EES that uses a single on?site power source must include a permanent switching means to connect a portable or temporary on?site power source. Which of the following is REQUIRED?(Temporary power source connection refers to an intern power source used in the primary power source is unavailable or during maintenance ) Interlocking is optional if the temporary source is supervised by qualified personnel The connection point must be marked with phase rotation and system bonding requirements The temporary source may be smaller than the on?site source if load shedding is used The connection may require modification of permanent wiring if approved by the AHJ Reference:517.30 E 4 44. 101 – 2026 Changes Part 11There is a significant change to the scope of NEC article 404 by including __________. 3-way "snap" switches Service equipment All of the answers are true Pull out switches Reference:404.1 A 45. 161 – 2026 Changes Part 11According to the NEC, an electric vehicle connector shall NOT be located within a __________ location as defined in 511.5. Class III Class I Unclassified Class II Reference:511.10 B 2 46. 141 – 2026 Changes Part 11According to 2026 NEC why are reconditioned capacitors not permitted to be installed?(The 2026 NEC introduces a new provision ,reconditioning which makes a Definitive and safety driven statement” reconditioned capacitors must not be installed”) They require special labeling that is not recognized by the NEC They cannot be effectively grounded after reconditioning Their dielectric materials and protective mechanisms degrade over time They are no longer manufactured in standard voltage classes Reference:460.3 47. 74 – 2026 Changes Part 11When cable ties are used as support for flexible conduit and tubing they shall be listed and identified for that purpose such as ________. (The 2023 edition of the NEC officially allowed the use of cable ties for cable systems.) Type 2C or 11C Type 21C Type 11 Type 25 or 21 S Reference:300.13 E 48. 47 – 2026 Changes Part 11The NEC essential general requirements for grounding and bonding have been restructured to provide a clear list format, restating clearly that the earth shall not be ________. (Previously this section was in one single dense paragraph. This formatting change should be helpful to all stakeholders.) Considered a ground-fault path Used for a voltage reference Used for dissipation of lightning Used for dissipation of surges Reference:250.4 A5 49. 85 – 2026 Changes Part 11New listing requirements for Metal-Clad Cable (Type MC) now requires ________ to be listed and identified for use. (Based on the UL standard 2239 for safety of hardware.) The cable only The fittings only The brackets Staples and/or straps Reference:330.2 50. 43 – 2026 Changes Part 11New panelboards are not allowed in a bathroom, addition additional supplementary circuit breakers to an existing panelboard is _________. (Prior to the 1993 code cycle it was common and allowed to install panels and subpanels in homes.) Permissible in commercial applications only Permissible Strictly prohibitted Permissible in residential applications only Reference:240.24 E 51. 142 – 2026 Changes Part 11According to 2026 NEC which of the following statements correctly describes the rules for installing reconditioned reactors and resistors? . Reconditioned resistors are permitted to be installed Neither reconditioned reactors nor reconditioned resistors are permitted to be installed Reconditioned reactors are permitted to be installed Both reconditioned reactors and reconditioned resistors are permitted to be installed Reference:470.3 A B 52. 112 – 2026 Changes Part 11A nongrounding?type receptacle with no grounding conductor present may be replaced with which of the following? only a non-grounding receptacle Any grounding?type receptacle as long as it is labeled No Equipment Ground A grounding?type receptacle supplied through a GFCI device all of these anwsers are true Reference:406.12 D 1 53. 148 – 2026 Changes Part 11 According to 2026 which of the following correctly describes the requirements for isolating means used to completely isolate equipment from all ungrounded conductors (other than service conductors)? Isolating switches must always be load?break rated and are required for all equipment regardless of design Only service disconnects are required to provide isolation; isolating switches are optional and need no markings or interlocks Isolating means are required unless the equipment can be deenergized by other methods such as draw out units non load break isolating switches must be interlocked with a series interrupting device or field marked with a warning Isolating switches may be opened or closed under load if the operator is qualified and PPE is worn Reference:495.22 54. 136 – 2026 Changes Part 11According to 2026 NEC when overcurrent protection is not provided at the generator terminals, the ampacity of the conductors from the generator terminals to the first distribution device containing overcurrent protection shall be not less than which of the following? 100% of the generator nameplate current rating under all conditions 125% of the generator nameplate current rating 80% of the generator nameplate current rating 115% of the generator nameplate current rating Reference:445.13 55. 178 – 2026 Changes Part 11Essential electrical system (EES) loads shall be served by two or more independent sources or sets of power sources and feeders. At least one of these sources must be __________. Off?site and capable of supplying only the life?safety branch Off?site and sized to supply the entire EES On?site and sized to supply the entire EES On?site but permitted to supply only the critical branch Reference:517.30 A 56. 151 – 2026 Changes Part 11What was the purpose of adding Parts VI and VII to Article 495 in the 2026 NEC?(The 2026 NEC introduces two entirely new parts article 495 parts VI and VII , expanding coverage beyond just transformers to include other types of oil insulated medium and high voltage equipment ) To expand transformer oil?testing requirements to all electrical equipment To eliminate all requirements for oil?filled equipment below 15 kV To specify requirements for oil?filled equipment other than transformers To allow reconditioned oil?filled equipment to be installed without listing Reference:article495 parts VI andVII 57. 97 – 2026 Changes Part 11A new mandate requires that when a raceway such as IMC with threads enters an enclosure, a locknut or fitting ______ be installed on the inside and outside of the enclosure. (This rule was buried in the bonding and grounding section so was sometimes not installed as required.) Can not Shall not Shall May Reference:342.29 58. 49 – 2026 Changes Part 11Grounding electrode conductors shall generally be continuous without a splice. A new exception to that rule includes ______ that is accessible. (Please note that this new option must be accessible for inspection and maintenance after installation does that include burial?) All set-screw style connectors Connectors that do not comply with ANSI/UL 467 standards Any split-bolt lug A listed mechanical grounding connector Reference:250.64 C 59. 149 – 2026 Changes Part 11 Which of the following correctly describes the requirements for grounding switches used in medium‑ and high‑voltage equipment?(This new section brings clarity and structure to the application by mandating key safeguards that help prevent accidental energization or unsafe switching sequences ) Grounding switches are required to be load‑break rated and may be used as the primary disconnecting means Grounding switches only need to be interlocked with the service disconnect, not with other power sources feeding the equipment Grounding switches may be operated at any time as long as the operator is wearing appropriate PPE Grounding switches must be interlocked with all disconnecting means so the disconnects are open before grounding, and cannot be closed while the grounding switch is in the grounded position Reference:495.26 60. 31 – 2026 Changes Part 11Service entrance conductors are allowed to be spliced or tapped, and the equipment used must be both listed and marked or identified for use. The new industry-recognized abbreviation that manufacturers can use instead of the entire phrase “suitable for use on the line side of service equipment” is _______. (in the past, this was not allowed, making changes challenging. Line side equipment must meet strict additional standards because they are not protected by an overcurrent device.) SSS SLS SVC SUS Reference:230.46 note 61. 34 – 2026 Changes Part 11There are now enhanced marking requirements for one- and two-family residential service disconnects and specifically state that the marking ______. (Some state rules also have additional requirements.) Letters shall be at least 1/2 inch high Must have a black background Shall be located adjacent to the disconnect Must have a red text Reference:230.70 B2 62. 157 – 2026 Changes Part 11Section 501.3(B) of the 2026 NEC is ____________. Reserved for future use A prohibition on reconditioned equipment in hazardous locations A new requirement for intrinsically safe systems A requirement for wiring methods in Class I Reference:501.3 B 63. 28 – 2026 Changes Part 11The NEC section requiring emergency disconnects for feeders to structures for one- and two-family dwellings was revised for clarity. The disconnect can be installed on the structure or within sight which is now _______ in this situation . (There were proposals to allow the emergency disconnects to be installed with an unlimited distance.) 60 feet 100 feet 75 feet 50 feet Reference:225.41 A1 64. 140 – 2026 Changes Part 11A key 2026 NEC update revises transformer overcurrent protection requirements to improve clarity and usability. Which of the following best reflects the nature of this revision? It reorganizes and modernizes the overcurrent protection tables and rules for clearer application It permits field?installed overcurrent devices to replace listed transformer protection It requires all transformers to be listed as energy?efficient regardless of rating It eliminates primary?side overcurrent protection for transformers under 1 kVA Reference:450.3 65. 3 – 2026 Changes Part 11Ground-Fault Circuit-Interrupter Protection (GFCI) requirements in dwelling units have made adjustments to include storage and work areas not intended as habitable rooms ______________. This modification is intended to decrease hazards. Regardless of grade level Only that have a floor located below grade level Only that have a floor located at grade level Only that have a floor located at grade or below grade level Reference:210.8 A 66. 89 – 2026 Changes Part 11The NEC has eliminated ________ as an option for securing Mineral-Insulated (Type MI) cable. (Type MI cable is often used for fire alarms, high temperature locations, and emergency systems. It can be vulnerable to mechanical stresses during the installation.) Hangers Straps and hangers Straps Staples Reference:332.3 67. 35 – 2026 Changes Part 11In ___________ installations with multiple energy sources, those sources not located adjacent to the service disconnect must now be marked and identified on the plaque or directory with their location. (Many of these more common disconnects are installed in locations such as garages, sheds, basements, and rooftops.) Commercial and industrial only All types of One- and two-family dwelling units only One- and two-family dwelling and multifamily only Reference:230.70 D 68. 61 – 2026 Changes Part 11New Article 266 covers feeders over 1000 volts AC or 1500 volts DC. The concept of “supervised installations” was added and permits a reduction in standard conductor sizing. The work of a supervised installation must be performed by ________. (The NEC is working to accommodate these unique high voltage systems.) A master electrician A licensed administrator Any engineer A qualified individual Reference:266.4 C 69. 189 – 2026 Changes Part 11 Which of the following is REQUIRED for the disconnecting means of a non‑moving attraction or portable structure such as a tent, concession, inflatable, or slide? It must be located exactly 6 ft inside the structure It may expose uninsulated live parts when opened without any additional restrictions It must be located at the service equipment supplying the carnival It must be located inside or outside the structure within 6 ft Reference:525.21 B 70. 98 – 2026 Changes Part 11A revised section for cable trays now requires a minimum space of ________ above the cable tray for access unless an exception is met. (In many commercial, industrial, and data centers these trays can become very congested.) 10 inches 12 inches 18 inches 6 inches Reference:392.18 F 71. 147 – 2026 Changes Part 11According to 2026 enclosures installed in damp or wet locations must be weatherproof. For enclosures in wet locations, raceways or cables entering above the level of uninsulated live parts must use fittings listed for which type of location?(Previously in section 495.3 These requirements are now clearly presented under section 495.4 with a specific title allowing designers, installers and inspectors to identify the applicable rules for damp and what locations easily) Indoor dry locations only Wet locations Corrosive locations only Hazardous (Class I Reference:495.4 72. 126 – 2026 Changes Part 11Fixed storage type water heaters 120 gallons or less are now classified as ? (Finally, clarity sometimes we need that ) Classification was removed Continuous load only for branch circuit conductors Continuous load As cold water heaters Reference:422.13 73. 95 – 2026 Changes Part 11Intermediate Metal Conduit (IMC) is permitted in areas subject to even severe corrosive influences provided they are protected by corrosion protection approved for the condition such as _______. (Some of these locations include agricultural with fertilizer exposure, wastewater facilities, coastal areas with salt environments, and industrial sites.) Adding caution tape Sealing the raceway Using galvanized steel Coating the raceway Reference:342.10 B 74. 133 – 2026 Changes Part 11Heat strips installed inside HVAC enclosures shall be________. (This change was prompted by the sale and widespread reports of supply houses selling heat strips not for specific applications compromising the listing of the entire unit ) Purchased from the manufacturer of the HVAC unit being worked on Listed as a field installable accessory None of these answers are correct Inspected by the AHJ (Authority having jurisdiction ) Reference:440.2 75. 33 – 2026 Changes Part 11Service disconnects in other than one- and two-family dwellings shall now be marked _______. (To also help reduce delays and confusion for first responders and utilities, especially with services with multiple disconnects such as solar.) Electrical disconnect Utility disconnect Service switch Service disconnect Reference:230.70 B 76. 94 – 2026 Changes Part 11An update to Underground Feeder and Branch-Circuit Cable (Type UF) now permits the use of _______ conductors as the minimum size for this burial type cable. (This popular cable commonly used in residential and light commercial underground applications can run long distances so this change can be a considerable cost savings.) 16 AWG Copper-Clad Aluminum 18 AWG Copper 14 AWG Aluminum 14 AWG Copper-Clad Aluminum Reference:340.104 77. 23 – 2026 Changes Part 11Automatic controls like motion sensors or time based controllers ________ as the sole means of controlling illumination in attics, underfloor spaces, and utility rooms. (To ensure that we are not left stranded in the dark in a potentially dangerous tight space.) are never allowed are permitted if a warning label is also provided are not permitted unless with a manual bypass are allowed Reference:210.70 C3 78. 62 – 2026 Changes Part 11The scope of new NEC Article 267 covers _______ operating at 1000 volts AC or 1500 volts DC. (Previously located in Article 235 along with other higher voltage systems.) Outside branch circuits and feeders Outside services All branch circuits and feeders Indoor branch circuits and feeders Reference:267.1 79. 197 – 2026 Changes Part 11 Which of the following best describes the updated GFCI requirement for receptacle outlets in Article 550?(Instead of specifying certain appliances and locations in a mobile or manufactured home the language Changed to reference section 210.8 This completely removes any differences between the old mobile home requirements And stick built home requirements ) Only outdoor receptacles require GFCI protection GFCI protection must be provided as required in 210.8 Receptacle outlets must be GFCI protected only when installed in bathrooms GFCI protection is optional if the receptacle is within sight of the panelboard Reference:550.13 B 80. 78 – 2026 Changes Part 11In the ampacity tables, the temperature rating of conductor type XHWN has been changed and it now sits in the _________ column of the table. (An example of a correction because XHWN was in the wrong column in previous code cycles.) 90 degree C 60 degree C 140 degree F 75 degree C Reference:310.16 81. 135 – 2026 Changes Part 11 According to 2026 NEC the outdoor disconnecting means for a split‑system HVAC unit in other than one‑ and two‑family dwellings must be marked with which of the following? The location of all indoor units it supplies, in accordance with 110.22(A) The location of the branch-circuit overcurrent device supplying the outdoor unit, in accordance with 110.22(A) The manufacturer’s installation instructions for both indoor and outdoor units The minimum circuit ampacity and maximum fuse size for the outdoor unit Reference:440.15 82. 16 – 2026 Changes Part 11There is now a new size limitation to permit a ______ minimum size Copper-Clad Aluminum Conductor to serve lighting outlets and exhaust fans in bathrooms and laundry rooms. (A Copper-Clad conductor has copper on the outside and aluminum in the center. Be sure to use wirenuts rated for copper and aluminum AL/CU.) 16 AWG 18 AWG 20 AWG 14 AWG Reference:Table 210.24(2) 83. 121 – 2026 Changes Part 11A new NEC revision adds requirements for identification and labeling of switchboards, switchgear, and panelboards. Under this revision, which section must these assemblies comply with? Section 250.8 Equipment grounding conductor identification 110.21 B Identification of disconnecting means Section 90.7 Examination of equipment for safety Section 408.3 Support and arrangement of busbars Reference:408.10 F 84. 53 – 2026 Changes Part 11The NEC requirement to provide an Intersystem Bonding Termination (IBT) device at the service equipment and separate structure now additionally able to be secured and connect directly to ___________. (ITBs are used as a common grounding point for other systems like telephone, cable, and broadband. These are frequently grounded improperly if at all.) A minimum 6 AWG copper grounding electrode conductor A satellite electrode A non-metallic enclosure Any location inside Reference:250.94 A 85. 169 – 2026 Changes Part 11Additional sources of electrical service permitted to supplement the utility service in healthcare facilities shall have the capacity and rating to meet the maximum actual demand likely to be produced by the connected load. Demand calculations for sizing these systems shall be based on one or more of the following EXCEPT __________. Prudent demand factors and historic data The nameplate rating of the largest single piece of equipment only Connected loads Feeder calculations Reference:517.4 B 86. 156 – 2026 Changes Part 11 Which of the following statements correctly reflects the revised requirements for reconditioned equipment used in hazardous (classified) locations? Reconditioned equipment is permitted Only equipment located outside the hazardous location requires reconditioning evaluation Reconditioned equipment is prohibited in all hazardous locations unless field evaluated by the AHJ All reconditioned equipment must be listed and marked Explosion Proof regardless of original classification Reference:501.3 87. 15 – 2026 Changes Part 11If a 16 AWG copper conductor is used to supply a branch circuit, the maximum overcurrent protection (circuit breaker) device rating is __________. (This circuit is not allowed to supply receptacle outlets.) 12 amperes 15 amperes 8 amperes 10 amperes Reference:Table 210.24(1) 88. 166 – 2026 Changes Part 11 Emergency electrical disconnects for fuel‑dispensing systems shall be installed in approved locations not less than 20 ft and not more than 100 ft from the dispensing devices they serve. Activation of the emergency shutoff device or electrical disconnect shall disconnect power to all of the following EXCEPT __________.(Just change Clarifies receptacles over or adjacent to motor fuel and dispensing devices and hazardous classified locations must be disconnected during an emergency ) All dispensing devices not supplied by intrinsically safe circuits All remote pumps serving the dispensing devices Intrinsically safe electrical equipment All associated power Reference:514.11 A 89. 8 – 2026 Changes Part 11For a dwelling unit outdoor outlet replacement for listed HVAC equipment, _____________. (This should help this industry with unwanted tripping because standard GFCIs were incompatible.) There are no longer exceptions; it shall be GFCI protected. GFCI protection is only suggested now. Listed Class C SPGFCI protection is permitted instead of GFCI Assured Grounding Reference:210.8 F ex 3 90. 110 – 2026 Changes Part 11In the 2026 NEC, wiring?devicetype switch requirements were relocated from Article 404 to which Article? Article 110 article 406 Article 314 Article 210 Reference:406 91. 172 – 2026 Changes Part 11Part II of Article 517 does NOT apply to which of the following spaces? Imaging suites used for diagnostic procedures Patient care areas used for direct preparation and care Category 1 treatment rooms used for invasive procedures Patient sleeping rooms in nursing homes wired under Chapters 14 and used exclusively for sleeping Reference:517.10 B 92. 145 – 2026 Changes Part 11 According to 2026 NEC what provision must be included in stationary battery installations to prevent damage and hazards?( this updates battery safety requirement , to control Thermal runaway especially in lithium-ion chemistry , gas buildup inventing in lead acid and nickel cadium systems , swelling, fire, or explosions and to keep battery life at its maximum ) A secondary disconnecting means located within sight of the battery room A timer‑based charging system that limits charging to off‑peak hours A cooling fan that operates whenever the battery is charging Overcharge control provisions to prevent the batteries from becoming overcharged Reference:480.14 93. 192 – 2026 Changes Part 11Where must the equipment grounding conductor (EGC) be connected for a separately derived system such as a generator? (Stated an article 525 exception it reads this section 525.31 shall not apply to portable generators used in accordance with 445.20 A exception ) Only at the service disconnect At any convenient point in the portable structure At the load terminals of the transfer switch At the generator or the first disconnecting means supplied by the generator Reference:525.31 94. 199 – 2026 Changes Part 11Which of the following is TRUE regarding service equipment for a mobile home under Article 550? It must be located at least 50 ft from the mobile home It shall not be mounted in or on the mobile home and must be within sight of the home it serves It cannot serve as the emergency disconnect It may be mounted on the exterior wall of the mobile home if weatherproof Reference:550.51 95. 152 – 2026 Changes Part 11According to the 2026 NEC clarification to 500.5(D)(1), Class III, Division 1 locations include which of the following?( This adjustment brings greater clarity to the user especially in areas involving dust and fiber hazard classifications in industrial environments ) Only locations where combustible dusts are present in suspension Any location containing Class I or Class II materials Only locations where ignitable fibers are manufactured Those locations specifically identified in 500.5(D)(1)(a) through 500.5(D)(1)© Reference:500.5 96. 185 – 2026 Changes Part 11Diagnostic imaging and treatment equipment shall be installed in accordance with which portion of the NEC?(The 2026 NEC revision clarifies and expands the scope of part five vertical 517 by stating that it applies to all diagnostic imaging and treatment equipment not just x-ray systems ) Article 700 Article 517 Article 645 Article 760 Reference:517.7 97. 170 – 2026 Changes Part 11All activities, systems, and equipment that are new or altered in patient care spaces shall be designed and installed to meet the requirements of which of the following?(NFPA 99 category 1 failure likely to cause major injury or death category two failure could cause minor injury category three failure unlikely to cause injury but may cause discomfort category 4 failure has no impact on safety or care ) Category 1 through Category 4 requirements NFPA 99 health care faculties code chapter 4 Only Category 3 and Category 4 spaces Only the category assigned by the authority having jurisdiction Only Category 1 and Category 2 spaces Reference:517.7 & Informational note 98. 131 – 2026 Changes Part 11Reconditioned motors are permitted to be installed only if the reconditioning has been performed in accordance with which of the following? The manufacturers instructions The installers field evaluation or local AHJ preference The reconditioning contractors documented quality?control program The motor nameplate data and conductor ampacity tables Reference:430.3 99. 153 – 2026 Changes Part 11 According to the 2026 NEC, the risk of ignition from optical radiation must be evaluated for which types of equipment when the radiation falls within the 380 nm to 10 μm wavelength range and may enter a hazardous location?(Would you call this forward thinking? may be necessary in hazardous location safety. Lasers are here to stay ) Only laser equipment located inside the hazardous location Only equipment specifically listed for Class I Laser equipment Only optical fiber equipment located outside the hazardous location Reference:500.8 G 100. 88 – 2026 Changes Part 11For Mineral-Insulated, Metal-Sheathed Cable (Type MI) the _________ is not required to be listed and identified. (There is an increasing demand for these systems’ reliability and safety.) Type MI fittings Type MI Cable Straps and hangers Reference:332.2 Back Save Progress Retry Finish